King´s Bay Resources Corp.
King’s Bay Commences Helicopter-borne VTEM Plus Survey over Lynx Lake Copper-Cobalt Project, Southeastern Labrador
EQS Group-News: King’s Bay Gold Corp. / Key word(s): Interim Report/Miscellaneous King’s Bay Commences Helicopter-borne VTEM Plus Survey over Lynx Lake Copper-Cobalt Project, Southeastern Labrador Vancouver, February 28th, 2017 – King’s Bay Gold Corporation (TSX.V: KBG), (FSE: KGB1), operating as “King’s Bay”, a mining exploration and development company based in Vancouver Canada is pleased to announce that Geotech Ltd., of Aurora, Ontario has commenced a 382 line kilometer helicopter-borne VTEM(TM) (Versatile Time Domain Electromagnetic) Geophysical Survey over King’s Bay’s 100% owned Lynx Lake Copper-Cobalt Project in southeastern Labrador. Geotech Ltd. has advised King’s Bay that it expects to complete this survey by mid-April. The VTEM(TM) system has a penetration depth of over 800 m, with a low Base Frequency (30Hz) for penetration through conductive overburden cover, coupled with a 2-3 meters High Spatial Resolution. This system is advertised to be able to delineate potential drill hole targets from the airborne results. In addition, it also has excellent resistivity discrimination to enable the detection of weak anomalies. Geotech has flown more than 3,000,000 line-kilometres worldwide with its proprietary and industry-leading VTEM(TM) system with confirmed results in many different deposit and host geologies. Kevin Bottomley states “This a very exciting time for the company. The commencement of our VTEM(TM) survey over Lynx Lake property is a extremely important step towards identifying high priority drill targets.” Lynx Lake Project The Lynx Lake Copper-Cobalt Property consists of 959 mineral claims encompassing a land area of approximately 240 square kilometers, located 100 kilometers southeast of Happy Valley Goose Bay, Newfoundland and Labrador. Historic grab sampling on the property has returned samples assaying up to 1.39% Cu, 0.94% Co, 0.21% Ni and 6.5g/t Ag. Government regional low resolution residual magnetic surveys and preliminary handheld electromagnetic surveys done by local prospectors have shown strong conductors beneath the overburden, and provide incentive to explore the area further for additional subsurface mineralization. The Project is located directly adjacent to a 3 phase powerline and the Trans-Labrador Highway. NI 43‐101 Disclosure Edward Lyons, P. Geo. supervised the preparation of the technical information in this news release and is a qualified person as defined by National Instrument 43‐101. About King’s Bay On Behalf of the Board For Investment Inquiries please contact: Forward Looking Statements
End of Corporate News |
Language: | English |
Company: | King’s Bay Gold Corp. |
Suite 1450, 789 West Pender Street | |
BC V6C 1H Vancouver | |
Canada | |
Phone: | +1 604 681 1568 |
E-mail: | info@KingsBayRes.com |
Internet: | www.KingsBayRes.com |
ISIN: | CA49579Q2099 |
Valor: | A2AN0E |
Listed: | Regulated Unofficial Market in Berlin; Open Market in Frankfurt ; Canadian Venture Exchange, Toronto |
End of News | EQS Group News Service |